Shandong Qilide Heavy Industry Group Co., Ltd.
2500kN/2×630kN Dam Top Gantry Crane: A “Jack of All Trades” for Hydropower Projects
Release time:
Jul 16,2025
In modern hydropower and water conservancy projects, dam crest gantry cranes play an extremely critical role. They are the core equipment to ensure the safe and stable operation of the dam, achieve efficient power generation and precise flood discharge.
In modern hydropower and water conservancy projects, dam crest gantry cranes play an extremely critical role. They are the core equipment to ensure the safe and stable operation of the dam, achieve efficient power generation and precise flood discharge. Among them, the 2500kN/2×630kN dam crest gantry crane stands out in the construction and operation and maintenance of many water conservancy facilities with its powerful comprehensive performance, and has become a highly anticipated "star equipment" in the industry.
1. Functional characteristics: a multi-functional water conservancy heavy equipment
The functional design of the 2500kN/2×630kN dam crest gantry crane is closely centered on the diversified needs of hydropower projects, and it can be called a "jack of all trades" in the field of water conservancy projects. Its 2500kN main lifting mechanism, like a powerful "strongman", is mainly responsible for the installation and maintenance of large equipment in power stations. Taking the common single-unit bulb-type hydroelectric generator set as an example, during the installation and commissioning stage of the unit and its ancillary equipment, or when maintenance is required during subsequent operation, the 2500kN main lifting mechanism can accurately lift and smoothly transport the unit components weighing several tons or even tens of tons with its powerful lifting capacity, ensuring the smooth progress of equipment installation and maintenance work, and laying a solid foundation for the long-term stable operation of the power station.
The 2×630kN lifting mechanism is like a flexible "craftsman", mainly responsible for the operation of various small and medium-sized gates and trash racks. At the water inlet of the hydropower station, the water inlet inspection door shoulders the key mission of cutting off the water flow during equipment maintenance. The 2×630kN lifting mechanism can accurately open and close it to create safe conditions for subsequent maintenance operations; the trash rack is responsible for intercepting floating objects in the water flow to prevent it from entering the turbine and affecting the normal operation of the unit. The 2×630kN lifting mechanism can timely lift and clean the trash rack to ensure smooth water flow. In addition, during the maintenance of the sluice gate, the lifting mechanism can also efficiently complete the opening and closing of the maintenance door and horizontal transportation, effectively ensuring the safe and stable operation of the sluice gate.
2. Structural analysis: a stable and reliable steel body
From the perspective of structural composition, the 2500kN/2×630kN dam top gantry crane is a precise and stable steel structure. Its gantry metal structure, as the supporting body of the entire equipment, is usually welded with high-quality steel. Each component is carefully designed and manufactured, with excellent strength and stability. The main beam, as the main load-bearing component, is mostly a welded box beam structure. This structural form can not only effectively disperse the huge pressure generated when lifting heavy objects, but also reduce its own weight while ensuring strength, thereby improving material utilization. The gantry legs are reliably connected to the main beam to jointly build a solid frame, ensuring that the gantry crane always remains stable in a complex operating environment, like a resolute guard, firmly rooted in the dam top.
As key components for realizing the lifting and horizontal movement functions, the main trolley and the auxiliary trolley are also exquisitely designed. The main trolley is equipped with a 2500kN lifting mechanism, equipped with an advanced power system and high-precision transmission device, which can accurately control the lifting height and speed to meet the stability and accuracy requirements of large equipment lifting. The 2×630kN lifting mechanism of the auxiliary trolley also focuses on reliability and flexibility in structural design. Through reasonable layout and selection, efficient gate and trash rack operation is achieved. In addition, the operating mechanism adopts advanced drive technology, such as the common "three-in-one" drive device with a variable frequency motor with a built-in brake and a hard-toothed reducer directly connected, which can provide stable power for the travel of the gantry crane, and through precise frequency conversion control, the operating speed can be flexibly adjusted to meet the needs of different operating scenarios.
3. Technical highlights: the crystallization of wisdom of integration and innovation
The 2500kN/2×630kN dam top gantry crane integrates a number of cutting-edge technologies at the technical level, showing excellent performance advantages. In terms of electrical control system, advanced PLC (programmable logic controller) control technology is adopted to achieve precise and automated control of the operation of various mechanisms of the gantry crane. The operator only needs to input instructions through the operation panel in the operation room, and the PLC will respond quickly, coordinate and control various actions such as lifting, walking, and rotation to ensure the accuracy and efficiency of the gantry crane operation. At the same time, the system also has powerful fault diagnosis and early warning functions, which can monitor the operating status of each component of the gantry crane in real time. Once an abnormality is found, it will immediately issue an alarm and provide detailed fault information, which is convenient for maintenance personnel to check and deal with it in time, greatly improving the maintenance efficiency and reliability of the equipment.
In terms of safety protection technology, the 2500kN/2×630kN dam top gantry crane has achieved the ultimate. The lifting weight limiter is like the "intelligent guard" of the equipment, monitoring the lifting weight in real time. When the lifting weight reaches 105% of the rated value, the system will issue a warning signal to remind the operator to pay attention; once the lifting weight reaches 110%, the system will immediately cut off the power supply of the rising circuit and force the lifting action to stop to prevent safety accidents caused by overload. The position limiter uses precise sensor technology to monitor the lifting height, the operating position of the trolley and the trolley in real time. When the equipment runs to the limit position, it quickly sends a signal and automatically cuts off the power supply of the corresponding mechanism to prevent the equipment from being damaged due to excessive operation. In addition, safety devices such as buffers and track clamps also provide all-round protection for the safety of the gantry crane during operation. The buffer can effectively absorb the energy generated by the collision of the equipment and reduce the impact force; the track clamp tightly clamps the track when the equipment stops working to prevent the gantry crane from being displaced by wind or other external forces.
IV. Engineering application: Helping the hydropower industry take off
In the actual construction and operation and maintenance of hydropower projects, 2500kN/2×630kN dam top gantry cranes can be seen everywhere, playing an irreplaceable and important role. Taking the Hubei Duhe Pankou Hydropower Station as an example, the 2500kN bidirectional double-rotating dam top gantry crane installed in it undertook the lifting and installation of a large number of turbine generator sets and their ancillary equipment during the construction stage of the power station, ensuring that the units were put into production on time and smoothly. During the operation of the power station, the gantry crane efficiently completed the daily operation and maintenance tasks of the water inlet inspection door, trash rack and sluice inspection door, ensuring the safe and stable operation of the power station. For example, in the Qingshuitang Hydropower Station in Chenxi, Hunan, the 2500kN main trolley of the dam top gantry crane is responsible for the installation and maintenance of the turbine generator set, and the 2×630kN is responsible for the operation of the water inlet inspection door and other equipment, providing a solid guarantee for the normal operation of the power station.
V. Development trend: towards intelligence and greening
Looking to the future, with the rapid development of science and technology, the 2500kN/2×630kN dam top gantry crane will stride towards intelligence and greening. In terms of intelligence, it will further integrate advanced technologies such as artificial intelligence and the Internet of Things to realize remote intelligent control and unmanned operation of the gantry crane. By installing a large number of sensors on the gantry crane, the equipment operation data is collected in real time, and the data is deeply mined using big data analysis and artificial intelligence algorithms, accurate prediction and intelligent diagnosis of equipment failures can be achieved, maintenance plans can be arranged in advance, equipment failure rates can be reduced, and operation and maintenance efficiency can be improved. In terms of greening, we will be committed to developing more efficient and energy-saving drive systems and energy management technologies to reduce energy consumption during gantry crane operation and reduce the impact on the environment. For example, measures such as adopting new energy-saving motors, optimizing hydraulic system design, and introducing renewable energy power supply will promote the development of dam crest gantry cranes in a more environmentally friendly and sustainable direction.
As the core equipment in the field of hydropower and water conservancy projects, the 2500kN/2×630kN dam crest gantry crane has made great contributions to the vigorous development of my country's hydropower industry with its powerful functions, stable structure, advanced technology and wide application. In the future, with the continuous innovation and upgrading of technology, it will continue to shine in the construction and operation and maintenance of hydropower projects, and contribute more to ensuring national energy security and promoting the development of green energy.
You can also learn more about the industry.