200t shipbuilding gantry crane: the “air carrier” of shipbuilding


Release time:

Jul 16,2025

In the noisy and busy shipyard, the lifting of giant hull sections and the transportation of heavy equipment are inseparable from the help of an "air strongman" - 200t shipbuilding gantry crane. With steel as its bones and machinery as its muscles

In the noisy and busy shipyard, the lifting of giant hull sections and the transportation of heavy equipment are inseparable from the help of an "air strongman" - 200t shipbuilding gantry crane. With steel as its bones and machinery as its muscles, it moves precisely on the high-altitude track of the shipyard, steadily delivering tens or even hundreds of tons of heavy objects to the designated location, becoming an indispensable core equipment in the shipbuilding process.
1. "Customized" performance born for shipbuilding
The design of the 200t shipbuilding gantry crane has been deeply imprinted with the unique needs of the shipbuilding industry since its birth. Its 200-ton rated lifting capacity just matches the weight requirements of key components such as hull sections, main engine bases, and superstructure modules commonly used in large ship construction. In actual operations, it can not only lift 200 tons of heavy objects at a single point, but also achieve a larger span of lifting through double hook linkage, and flexibly respond to the high-precision requirements of "suspended docking" during hull assembly.

Unlike ordinary gantry cranes, the track gauge of shipbuilding gantry cranes is often designed to be extra wide, and the track gauge of some equipment can reach more than 30 meters. This is to adapt to the layout of "hull in the middle, equipment on both sides" in the shipyard - the wide gantry is enough to accommodate the entire hull section, so that the lifting operation is not limited by space. At the same time, its running track is laid along the length of the slipway or dock, covering a range of hundreds of meters. With the lateral movement of the trolley, a huge "air working surface" is formed to meet the full process lifting needs of the ship from keel laying to superstructure installation.
2. "Precision Philosophy" in Steel Structure
Approaching the 200t shipbuilding gantry crane, the first thing that shocks people is its huge and regular steel structure. The gantry consists of two thick door legs and a cross-beam, standing on the slipway like a giant "door frame". The main beam mostly adopts a box-type welded structure, and the densely distributed reinforcement ribs inside are like the ribs of the human body, which not only reduces its own weight, but also evenly disperses the stress during hoisting, ensuring that it will not deform or vibrate under a load of 200 tons.

The "heart" of the gantry crane is hidden in the lifting trolley under the main beam: the winch is connected to the hook through multiple layers of high-strength steel wire ropes, and the hydraulic brake can achieve emergency braking within 0.5 seconds, and can firmly lock the heavy object even if the power is suddenly cut off; the trolley running mechanism adopts variable frequency speed regulation technology, which can achieve fine-tuning from "snail speed" to rapid movement of tens of meters per minute, ensuring that the heavy object can be accurately docked to the "millimeter level". The walking mechanism of the gantry is even more "stable as Mount Tai" - multiple sets of driving wheels and driven wheels are evenly distributed at the bottom of the gantry legs, and with the guide wheels on both sides of the track, it can not only allow the gantry crane weighing hundreds of tons to move smoothly along the track, but also resist the vibration generated by the hull welding.
3. Hard-core responsibility on the "battlefield" of the shipyard
In the key links of shipbuilding, the role of the 200t shipbuilding gantry crane is irreplaceable. When the hull section is prefabricated in the workshop, it will slowly move along the track to the top of the section, and the hook will drop, hook and lift accurately, lifting the tens-meter-long steel structure section to the predetermined position of the slipway, and achieve "air docking" with other sections. At this time, the "micro-speed control" function of the gantry crane is crucial-the operator uses the joystick to achieve "centimeter-level" lifting and translation, and cooperates with the command of the ground workers to perfectly align the connection holes of the two sections, laying a solid foundation for subsequent welding.

In the "general assembly stage" before the ship is launched, it is even more busy as a "dispatcher": it hoists hundreds of tons of main engines into the engine room, and then steadily places the superstructure module on the hull deck, and can even cooperate with special hoists to hoist precision parts such as propellers and rudder blades. Even when the ship is repaired, it can easily lift the damaged hull section, saving a lot of dismantling time for the shipyard. It can be said that the birth of every ship, from 10,000-ton giant ships to special ships, is inseparable from the busy figure left by the 200t shipbuilding gantry crane in the sky.
4. "Double protection" of safety and intelligence
For giant equipment that hoist 200 tons of weight, the word "safety" is as heavy as Mount Tai. The 200t shipbuilding gantry crane is equipped with multiple safety barriers: the lifting weight limiter is like a "smart scale", which will immediately sound an alarm and cut off the lifting power once overloaded; the height limiter can prevent the hook from hitting the top, and the travel limiter prevents the gantry crane from violently colliding with the buffers at both ends of the track; in windy and rainy weather, the windproof track clamp will firmly lock the track, and it will not slip even in strong winds.

With the intelligent transformation of the shipbuilding industry, modern 200t shipbuilding gantry cranes are evolving in a "smarter" direction. The remote control system allows operators to complete the lifting in an air-conditioned room through high-definition cameras and sensor data, avoiding the risks of high-altitude operations; the Internet of Things technology monitors parameters such as wire rope wear, motor temperature, brake pad thickness in real time, and warns of potential faults in advance; some high-end equipment even introduces AI visual recognition, which can automatically identify the center of gravity of the lifting components and assist operators in optimizing the lifting angle.

From wooden sailboats to steel giant ships, the history of shipbuilding is also a history of the evolution of lifting equipment. The 200t shipbuilding gantry crane, with its perfect combination of power and precision, has witnessed the transformation of giant ships from drawings to reality, and also carries the infinite dream of human beings to explore the ocean. In the future, with the in-depth application of intelligent technology, this "air porter" will surely inject new impetus into the upgrading of the shipbuilding industry with a more efficient and safer attitude.

You can also learn more about the industry.

Jul 16,2025

200t shipbuilding gantry crane: the “air carrier” of shipbuilding

In the noisy and busy shipyard, the lifting of giant hull sections and the transportation of heavy equipment are inseparable from the help of an "air strongman" - 200t shipbuilding gantry crane. With steel as its bones and machinery as its muscles

Jul 16,2025

Garbage grab crane: the "steel scavenger" in the city cleaning chain

Behind the massive amount of garbage generated in cities every day, there is a group of special "steel scavengers" working silently - they stand above waste incineration power plants, landfills or transfer stations

Jul 16,2025

2500kN/2×630kN Dam Top Gantry Crane: A “Jack of All Trades” for Hydropower Projects

In modern hydropower and water conservancy projects, dam crest gantry cranes play an extremely critical role. They are the core equipment to ensure the safe and stable operation of the dam, achieve efficient power generation and precise flood discharge.

Jul 16,2025

900-ton beam shifter: the "strongman" of bridge construction

In modern bridge construction projects, the 900-ton beam mover is like a powerful "steel giant" that undertakes the heavy task of moving large beams and becomes an indispensable key equipment in the entire construction process.